WELCOME TO THE IES 2026 INDUSTRY PROGRESS REPORT SUBMITTAL SITE
Submission tools
submission window and fees
Accepted submittals will be:
LIGHT SOURCES
LUMINAIRES
POWER SUPPLIES
CONTROLS
LIFE SAFETY
ACCESSORIES
MATERIALS
SOLAR
|
RESEARCH
PUBLICATIONS
DESIGN TOOLS
|
INSTRUCTIONS & GUIDELINES
-
All lighting PRODUCTS must be introduced commercially between August 1, 2025 and July 31, 2026.
-
All RESEARCH, PUBLICATIONS and DESIGN TOOLS must be completed (including all materials and/or research results) and announced between August 1, 2025 and July 31, 2026. Note that any research submitted must include in the support materials the full body of the research report for the Industry Progress Committee to determine its significance. Any pre-publication materials will not be disseminated outside the Industry Progress Committee.
requirements
Accompanying Materials:
Product Images:
-
-
Include one or more JPG product image(s) filed with your submission – do not send application images.
-
Must be high resolution with a minimum of 1000 pixels along each image axis.
-
Must be a photo of the product, the cover/introduction page of the research or publication, or captured images of the design tool in action.
-
May show a company logo ONLY if it is normally on the product. No additional company logo or information can be added to the image that further promotes the product.
-
Become the property of IES, and can be used for presentation and publication.
-
Support Documents:
-
-
Appropriate supporting information MUST BE SUPPLIED for each of your significance claims. An electronic file for each technical significance is required for the Committee to review the submittal.
-
A competitive market comparison/matrix is required for products that claim an advancement in a technical feature. This information is for Committee use only and will not be distributed or published.
-
Support files may include, but are not limited to:
-
Catalog sheets / cut sheets / installation drawings
-
Test records – photometric tests (pdf), LM-79/80 reports, independent test reports (No .IES files)
-
Calculations – layout showing dimensions, calculation summary and light levels
-
Drawings, illustrations
-
NO executable files (*.exe) or raw data files (*.ies) are accepted, and will not be considered
-
NO video files are accepted
-
Marketing brochures must include technical information and verified data, not just product photos
-
-
The total size of the attached support documents must not exceed 15MB.
-
Promotional Requirements
A Progress Report acceptance is only recognition of an item’s unique new feature(s) as new to the industry, and its use is subject to restrictions:
-
Acceptance is not to be promoted in a way that states or implies that IES endorses the product or has verified any product characteristic. To this end, any statement of IES recognition should be physically separated from product or marketing claims.
-
It must be clear that only the specific product recognized in the Report is promoted as being accepted.
-
Promotion of Progress acceptance of products cannot commence until the date that will be included in the acceptance letter.